- Fixed newspaper and timer overlays not working correctly on disabled cameras.
- Fixed major issues with the occlusion culling.
- Aligned UVs for 10m drywall panels so that the bricks line up correctly.
- Made the newspaper overlay a proper CameraOverlay object.
- Added a purple trim to the round 1 walls.
- Fixed the shape and lightmaps on the round 1 doorway stairs.
- Slowed down and tweaked the opening doorway camera shot.